Engineering Decision Latency (Quan's Domain)
Executive Summary
- Issues tracked: 87
- Issues executed: 81 (93.1%)
- Average total latency: 26.4 days
- Median total latency: 20.0 days
- Trend: improving
Key Performance Indicators
- Problem → Decision: 11.4 days (average)
- Decision → Execution: 15.0 days (average)
- Stalled decisions: 6 issues decided but not yet executed
By Sub-Domain
Hardware (61 issues)
Primary focus: Battery design, V3 development, charging systems, device reliability
- Average latency: 23.0 days
- Median latency: 15.0 days
- Problem → Decision: 13.8 days
- Decision → Execution: 9.2 days
- Execution rate: 93.4%
Top recurring issues:
- battery/charging: 36x
- version migration: 14x
- connectivity: 1x
- customer support: 1x
- firmware/updates: 1x
Firmware (26 issues)
Primary focus: OTA updates, bug fixes, stability, feature implementation
- Average latency: 34.5 days
- Median latency: 26.0 days
- Problem → Decision: 5.9 days
- Decision → Execution: 28.6 days
- Execution rate: 92.3%
Top recurring issues:
- firmware/updates: 21x
- customer support: 2x
- battery/charging: 2x
- connectivity: 1x
- training: 1x
Temporal Trend
Evolution of decision latency over time:
- 2024: 53.4 days average
- 2025: 24.0 days average
- 2026: 18.0 days average
Analysis:
Decision velocity is improving over time. Recent engineering decisions are being executed faster, indicating better processes and/or reduced technical debt.
Recurring Issues
Issues that appear most frequently in engineering domain:
- battery/charging: 38x occurrences
- firmware/updates: 22x occurrences
- version migration: 14x occurrences
- customer support: 3x occurrences
- connectivity: 2x occurrences
- training: 2x occurrences
Stalled Decisions
Issues where a decision was made but execution has not yet occurred (6 total):
ISSUE-0058
- Days since decision: 21
- Context: Malachi Burke: I want to see the battery and Wi-Fi signal level so that I can notify operator, the o...
ISSUE-0059
- Days since decision: 21
- Context: Faisal: want to see the battery and Wi-Fi signals levels so that I can notify operator in case of pr...
ISSUE-0060
- Days since decision: 1
- Context: Jess Main: I feel like our old ones ones-
Jess Main: It might have just been battery problems, but s...
ISSUE-0061
- Days since decision: 1
- Context: Jess Main: Most of them will be related to battery problems and overheat problems....
ISSUE-0086
- Days since decision: 1
- Context: Quan Gan: The OTA route online, so he had them log in, but then we have the server issue, so he wasn...
Recommendations
1. Hardware Sub-Domain
- Battery/charging issues dominate with 36 occurrences
- Action: Accelerate V3 rollout to address persistent battery safety concerns
- Action: Establish pre-emptive battery swap protocol for at-risk units
- Action: Document battery handling SOPs to reduce user-induced failures
2. Firmware Sub-Domain
- OTA update reliability is a recurring pain point with 21 issues
- Action: Implement offline firmware update capability (already in progress)
- Action: Improve OTA failure diagnostics and user feedback
- Action: Create regression test suite to prevent update-induced bugs
3. Decision Velocity
- Average problem-to-decision time: 11.4 days
- Average decision-to-execution time: 15.0 days
- Action: For recurring issue types (battery, firmware), create pre-approved decision playbooks to reduce problem→decision latency
- Action: For execution delays >30 days, implement mid-cycle check-ins to unblock engineering resources
4. Cross-Functional Dependencies
- Many engineering issues require Operations support for customer communication, training, or logistics
- Action: Establish clear handoff protocol when engineering decisions require ops execution (e.g., V3 swaps)
- Action: Include Operations in early decision discussions for customer-impacting changes
5. V3 Migration Strategy
- V3 appears in 14 issues across hardware/firmware
- Action: Treat V3 rollout as top engineering priority to eliminate legacy hardware issues
- Action: Track V3 adoption rate and correlate with issue reduction metrics